Configure assembly order consumption basis (Planned vs Actual)

Last updated: July 1, 2026

Set Planned or Actual consumption basis on BOM lines so assembly orders deplete components correctly when yield varies from plan.

Collection: Work Orders: Admin Setup
Priority: P1


Who this is for

Account administrators and product managers defining how component quantities scale when finished good yield differs from plan.

Before you begin

Consumption basis options

Basis

Behavior

Planned

Component depletes fixed BOM quantity regardless of actual finished good yield

Actual

Component quantity scales proportionally with actual finished good output vs planned

When to use each

Component type

Recommended basis

Example

Labels, boxes, packaging

Planned

10,000 labels used even if yield is 9,900 units

Bulk raw materials (liquid, powder)

Actual

Material scales with actual units produced

Fixed batch additives

Planned

Full batch size used regardless of small yield variance

Steps

1. Set on BOM (recommended default)

Open the finished good's Bill of Materials and set Consumption Basis (or Basis) on each component line to Planned or Actual.

This default flows to assembly orders created by Quick Complete.

2. Override on assembly order (ops)

Production staff can change Basis per line on the assembly order form when completing a batch (Complete assembly orders).

3. Verify with a test batch

Run a Quick Complete with actual yield below planned. Confirm:

  • Planned basis lines stay at fixed qty

  • Actual basis lines scale down with yield

What happens next

Correct basis configuration ensures accurate component depletion and inventory costs when yield varies.

See Planned vs Actual consumption FAQ.

Related articles

Still stuck?

Contact support if Basis column does not appear on assembly orders — verify BOM configuration and Work Orders module access.