How do I add extra costs and set the service fee on an in-progress work order through the API?
Last updated: November 13, 2026
Use this when labor or other costs are only known after production has started.
Extra-cost lines
GET /work-orders/{id}/extra-costslists the lines.Lines are per unit produced. quantity is multiplied by the quantity produced at completion.
A line only reaches assembly orders created after it’s added. Add lines before you quick-complete or complete a step.
POST /work-orders/{id}/extra-costsadds one. It requiresname,quantityandunit_price, and returns 201.PUT /work-orders/{id}/extra-costs/{extraCostId}edits a line.DELETE /work-orders/{id}/extra-costs/{extraCostId}removes a line.
quantity allows up to 6 decimal places. unit_price allows up to 2.
Service fee
PATCH /work-orders/{id}/service-fee with service_unit_price sets the per-unit fee. A second call replaces the first. A fee of 0 doesn’t mean no fee: at completion it falls back to the produced SKU’s manufacturing fee.``
When it works
These calls work on draft, planned and in-progress work orders. Completed and cancelled work orders return 422. They also return 422 if the cost rules feature isn’t enabled on your account. A work order that doesn’t exist returns 404.